As part of the Manzanita Corridor project within the City of Chico, MGE completed the design and PS&E for the widening of the bridges crossing Big Chico Creek and Lindo Channel. Both bridges are cast-in-place, multi-span, reinforced concrete slab superstructures supported on driven piles and pile extensions. Bridge aesthetic details included installation of custom barrier railing developed by a local artist and cobblestone finish treatments.

Client: Northstar Engineering

Key Facts:

  • Project was completed in 2008

Project Manager/Bridge Project Engineer:  Bob Sennett