Ellicott Bridge

MGE completed the seismic retrofit analysis, retrofit strategy determination, and final design and PS&E for the seismic retrofit of this 534-foot, three-span, steel plate girder structure crossing the Rubicon River on Eleven Pines Road within the Eldorado National Forest.  The

More Details...

BART Earthquake Safety Program

BART’s original system of 34 stations and 72 miles of track was constructed over 30 years ago using then state-of-the-art engineering techniques. While BART’s original design was advanced for the time, and the system survived the 1989 Loma Prieta earthquake

More Details...

Local Agency Seismic Retrofit Projects

As the prime consultant for this “On-Call” contract with Caltrans, MGE completed the seismic retrofit analysis, retrofit strategy determination, and final design and PS&E for the seismic retrofit of 24 bridges in Humboldt County.  Contract also included seismic retrofit projects

More Details...