Under an IDIQ contract with the US Army Corps of Engineers Sacramento District, MGE completed the design of improvements in conjunction with the construction of Fuse Gates at the Dam. Improvements included the design of the intake structure and conduit.
Flood Management
Success Dam and Reservoir Seismic Remediation Project
Under an IDIQ contract with the US Army Corps of Engineers Sacramento District, MGE performed an independent technical review (ITR) of the proposed retrofit design for the existing reinforced concrete conduit downstream of the control tower. The primary objective of
Morrison Creek Floodwall at Union Pacific Railroad South Sacramento Streams Flood Damage Reduction Project
Under an IDIQ contract with the US Army Corps of Engineers Sacramento District, MGE completed the design of flood protection improvements along the Union Pacific Railroad from the confluence of Morrison Creek and Unionhouse Creek upstream approximately 3,300-feet to the
Napa River Flood Protection Project Hatt Building to First Street, Napa, CA
Under an IDIQ contract with the US Army Corps of Engineers Sacramento District, MGE completed the plans, specifications, and cost estimating for channel widening along the right bank of the Napa River. Project improvements included construction of a soldier pile
Napa Creek Flood Control Project, Napa, CA
MGE, as the joint venture managing partner in Associated California Engineers, LLC, completed the design documentation report (DDR), plans, specifications, and cost estimating for modification of the reach of Napa Creek through the City of Napa between Main Street and